|
The construction of the $17.0 million Burlington International Airport parking facility and terminal renovation and expansion was much anticipated by travelers throughout the State of Vermont. The new three-level concrete parking facility accommodates 1,100 vehicles and is attached to the terminal by a 120-foot skywalk protecting travelers from adverse weather conditions.
The 18,000 square foot renovation and 12,000 square feet of new space provides travelers with enlarged ticket, baggage, and waiting areas and a new mezzanine, snackbar, restrooms, elevator and escalator. The attention to detail and design on this project is apparent from the propeller-designed ceramic floor tile to the quality of materials and craftsmanship in the maple woodwork, granite, wall carpet and glass block throughout the facility.
|
|